mikeosborne
2010-07-10, 04:20 PM
Some time when I am creating a corridor (or a a grading object) that has a link slope to surface sub assembly, the project in one (or two or three or etc) will project out 100's of feet away instead of where is is suppose to. I have attatched a screen shot of what I am talking. Any help would be great.