dfarris75
2006-11-06, 05:03 PM
I am making an attempt to create a corridor that has 12' pavement, 1.5' c&g, then grades 3% to the ROW (16.5'), and then grades 1% to the back of lot (100'). As you can see in the attached image, it is not reaching to the back of lot as I want it to.
I used a basic lane, basic c & g, link offset & slope (3%), and then link offset & slope (1%). Something isn't working right. I am not sure what. Can anyone help?
I used a basic lane, basic c & g, link offset & slope (3%), and then link offset & slope (1%). Something isn't working right. I am not sure what. Can anyone help?