Revit Wishes
2007-09-14, 04:40 PM
Summary: Even if it is an added column in the Revision Schedule, we need to be able to use letters and numbers to denote the revision sequence.
Description: Ability to have revision letters as well as numbers and workstage prefixes
How Used: A customisable revision numbering system that could have letters or ideally work stage prefixes as follows:
P1, P2 etc for Preliminary, T1, T2 for tender (billing) C1, C2 for Construction
Feature Affinity: Other
Submitted By: Andrew Dobson on September 12, 2007
Description: Ability to have revision letters as well as numbers and workstage prefixes
How Used: A customisable revision numbering system that could have letters or ideally work stage prefixes as follows:
P1, P2 etc for Preliminary, T1, T2 for tender (billing) C1, C2 for Construction
Feature Affinity: Other
Submitted By: Andrew Dobson on September 12, 2007