wmullett
2008-03-19, 03:07 PM
I'm looking at the possibility of linking multiple projects into one master plan for the purpose of 3D viewing the combined models. We are worried about file size and manuverability.
In our individual projects, the exterior shell exists on a separate workset. If we link the projects from a view that only uses the exterior shell workset, will that reduce the combined working memory size?
Thanks
In our individual projects, the exterior shell exists on a separate workset. If we link the projects from a view that only uses the exterior shell workset, will that reduce the combined working memory size?
Thanks