Re: Concrete Beam Schedules
We've added parameters to the concrete beams and let them drive the schedule.
The schedule refers to a legend that shows all the different bar configurations.
I model all the beams and let my engineer fill out the schedule in Revit.
Working great so far.
Re: Concrete Beam Schedules
I agree with the other Dave, works great...generally.
About the biggest hassle is that beams don't show up in the schedule until they exist in the model. So sometimes I'll do a large array of beams to build that initial schedule, then it can be filled out in any number of methods.
The other challenge is what happens when a given beam type is removed from the plan, it drops from the schedule too. This is often not desirable, rather a NOT USED put on that row in the schedule. Sometimes to solve that I'll make a beam graveyard off the project area where the beam can sit and therefore populate the schedule.
Re: Concrete Beam Schedules
Well for me Since I have to model them anyway, we pick out out typ beam width an depth for the project (24x24) and frame out the building using 1 beam type. Next I go around and duplicate each beam and give each beam it's own unique beam number (type) like 2B137. Then I'll go to the schedule and apply a manufacturer parameter (based on what level I want to call the beam schedule (ie canopy beam schedule) so I can filter them out.
I haven't seen what the fabricator has sent back for shops yet, but they haven't called or sent an RFI so I'm hoping they understand it.
Re: Concrete Beam Schedules
I learnt that if the rebar parameters is added to the family definition then it can be exported and modified in Excel and back imported. whereas if it is added as instance parameter then it can only be exported. The issue with family parameters is we will end up with so many unique beam types. What is the workaround? I am not sure if this could be handled by scripting and tapping the API objects.
Re: Concrete Beam Schedules
Everyone I know, and including my firm, ends up with many beam types (1 type per mark on plan). It is the best to deal with the task at hand.
Re: Concrete Beam Schedules
Dave,
Thanks for your response, Old Friend!
On another try, I successfully exported a Revit Structure model to a SQLExpress database, however I cannot find the "Structural Column Instance" table or the "Structural Beam Instance" table in the database.
The existance of such a table is mentioned here for RST:
http://wikihelp.autodesk.com/Revit/e...0-Exportin2140
I have created instance parameters to add rebar information, which I wish to review in Excel or Access. However these parameters and the standard "Rebar Cover" field parameters are not showing up in the exported database. Among the 200 plus tables in the database, where elese could these be saved to?
Thanks
Vish Urala
Re: Concrete Beam Schedules
That's a very good question. Sorry, but I don't have an answer for that one. I'm wondering if you need to make them as a shared parameter somehow (which I don't think they are) in order for them to get put to a schedule of any type.
I've never gotten in to the data base idea and the import/export thing. I get lucky. I just model the size and type (by beam name) and let my engineers fill out my schedule. They in turn are using Ram Concrete to model and design beams. Once designed they fill out the the rebar parameters for size, quantity and type.
Re: Concrete Beam Schedules
Can you post a snapshot of the beam schedule created in Revit?
Thanks!
2 Attachment(s)
Re: Concrete Beam Schedules
Quote:
Originally Posted by
kjagielska
Can you post a snapshot of the beam schedule created in Revit?
Thanks!
See attached.
The schedule calls out the bar size and type. The bar types are in a legend (created in a drafting view).
As David said, we typically use one number/mark per beam since by the time you get done there's usually something slightly different.