    I have created a large folder of generic models that I have loaded into my project in revit. I need to do a schedule of quantities of these models and th eonly way I have found to get quantities is by doing a material schedule, but the material schedule counts all the materials of each model as individual elements and not as one generic model? Is there any way to have a schedule of quantities that counts each model as one object?

  2. #2
    Certified AUGI Addict patricks's Avatar
    Join Date
    2004-06
    Location
    Memphis TN area
    Posts
    7,048
    Login to Give a bone
    0

    Default Re: CREATING A SCHEDULE FROM A GENERIC MODEL FAMILY?

    Under the Sorting tab, click off the checkbox for itemize every instance.

  3. #3
    AUGI Addict truevis's Avatar
    Join Date
    2004-07
    Location
    Massachusetts, USA
    Posts
    1,191
    Login to Give a bone
    0

    Default Re: CREATING A SCHEDULE FROM A GENERIC MODEL FAMILY?

    Make a Multi-Category schedule. You can then filter by Category.

  4. #4
    Member
    Join Date
    2009-05
    Posts
    4
    Login to Give a bone
    0

    Default Re: CREATING A SCHEDULE FROM A GENERIC MODEL FAMILY?

    thanks the multi schedule worked

    the only problem is that another office had created alarge number of their own generic models and i cannot seem to filter out their results in the schedule?
    Is there a way to create a new folder of families with a distinct name that will show up as a choice in my schedules?

    for example can i add a new family call "x" ?

  5. #5
    AUGI Addict truevis's Avatar
    Join Date
    2004-07
    Location
    Massachusetts, USA
    Posts
    1,191
    Login to Give a bone
    0

    Default Re: CREATING A SCHEDULE FROM A GENERIC MODEL FAMILY?

    Quote Originally Posted by smgdesignbuild View Post
    thanks the multi schedule worked

    the only problem is that another office had created alarge number of their own generic models and i cannot seem to filter out their results in the schedule?
    Is there a way to create a new folder of families with a distinct name that will show up as a choice in my schedules?

    for example can i add a new family call "x" ?
    Rather than trying to rename Families, I'd add a parameter like "Model" and filter the schedules on that parameter as needed.

  6. #6
    All AUGI, all the time
    Join Date
    2006-03
    Location
    London, UK
    Posts
    810
    Login to Give a bone
    0

    Default Re: CREATING A SCHEDULE FROM A GENERIC MODEL FAMILY?

    I filter by Type Mark, and then give each Generic Model Type a unique Type Mark.

Similar Threads

  1. Generic model family
    By ablood in forum Revit Architecture - General
    Replies: 5
    Last Post: 2017-06-15, 06:42 AM
  2. 2013: Generic Model - Schedule Reference Level
    By markusb in forum Revit Architecture - General
    Replies: 4
    Last Post: 2013-12-09, 03:54 PM
  3. Generic Model - Schedule Perimeter
    By gdb in forum Revit Architecture - General
    Replies: 3
    Last Post: 2010-02-17, 03:45 PM
  4. Creating a ceiling generic model
    By stephmre in forum Revit Architecture - General
    Replies: 1
    Last Post: 2007-11-03, 02:01 PM
  5. Family help! Used Mass but should have used Generic Model
    By Liz437 in forum Revit Architecture - Families
    Replies: 2
    Last Post: 2007-10-11, 07:06 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •