Originally Posted by
clog boy
Thanks Scott,
We don't use material takeoff. We schedule a more specific than that, for instance we have adapted the Assembly Code file (Uniformat Classifications, reformatted it to NL-sfb) and even that is a little too rough. We also made a project parameter to manually input the level of that wall and some other stuff so that our supplier can crosscheck the drawing with the schedule.
The gripe is that stacked wall elements can't have a mark, comment or any project parameter.