I am starting a renovation project for a public housing agency. It involves renovating 24 apartemtent kitchens in six different buildings. The kitchens are pretty much similar and the detailing will be virtual identical using standard detailing.

One of my thoughts is to set each kitchen up as a separate level.

Another thought is to set each kitchen up on the same level. My concern here is to keep track of 24 different kitchens, all of which look almost the same.

A third thought would be to set up separate projects, but that sounds like a real pain.

There will be no other elements of the buildings that I'll be interested in, so nothing else matters.

Thanks in advance.