Hi,
I have a large Hospital Project, which has 6 Sectors (All one building), each Sector is divided by the Movement Joints.
Sectors 1, 2 & 3 are 7 storey Steel Frame construction, Sectors 4,5 & 6 are Concrete.
We will be required to provide drawing documentation to include all sectors as well as separate sector drawings.
All revit models will need to be multi user.
What is the best way to split the project.
1. Do you have a Revit file for each sector, linking into each.
2. do you have one file with the sectors split by workset.
if option 1. do you have a Master Revit file which links in all 6 sectors, and detailing/shceduling etc is done from that one. If so is there any limitations (ie. cannot schedule all linked files on one schedule, do sections work across linked files etc.) and does Phasing work?
if option 2. i think the file is going to get huge.
Thanks