    Question Transfer Schedule between projects

    Good morning,

    Is there a way of transfering or copying a schedule created in one project to another?

    Thanks in advance!!

  2. #2
    AUGI Addict DaveP's Avatar
    Join Date
    2002-12
    Location
    St Paul, MN
    Posts
    1,569
    Login to Give a bone
    0

    Default Re: Transfer Schedule between projects

    Piece of cake!
    You need to use Insert Views from File on the Insert tab, not Transfer Project Standards.
    You don't need to have the project that you're getting the schedule from open, either.

  3. #3
    I could stop if I wanted to
    Join Date
    2001-02
    Location
    Allentown, PA
    Posts
    207
    Login to Give a bone
    0

    Default Re: Transfer Schedule between projects

    Sweet!! Thanks. I will have to check that out. Just made my day a whole lot easier!!

  4. #4
    Certifiable AUGI Addict Dimitri Harvalias's Avatar
    Join Date
    2015-12
    Location
    Vancouver, BC Canada
    Posts
    3,753
    Login to Give a bone
    0

    Default Re: Transfer Schedule between projects

    If both files are open, copy/paste works as well.

  5. #5
    Active Member
    Join Date
    2008-04
    Posts
    86
    Login to Give a bone
    0

    Default Re: Transfer Schedule between projects

    Has anyone else been experiencing this...?
    Revit 2015: I have been copying and pasting schedules between 3 different pilot projects and, consistently, the To Room and From Room function has been malfunctioning. (Families are room aware with Room Calculation point turned on).

    In context, I paste a schedule from a project to a project. I would expect the windows to report which room they are placed, but there is nothing in the To Room or From Room field and nothing to select in the drop down. To troubleshoot, I create a simple working schedule with To Room and From Room and the window reports the location correctly. This shows that the pasted schedule is not working correctly.
    I tried:
    -Removing the room fields and replace with no success
    -removing windows and replacing windows with no success
    The solution has, unfortunately, been to rebuild the schedule from new.

  6. #6
    Active Member
    Join Date
    2012-04
    Location
    Los Angeles, CA, USA
    Posts
    84
    Login to Give a bone
    0

    Default Re: Transfer Schedule between projects

    Are you using a shared parameter in the schedule that might not be in all of the projects?

  7. #7
    AUGI Addict
    Join Date
    2015-11
    Location
    Madison, WI
    Posts
    1,318
    Login to Give a bone
    0

    Default Re: Transfer Schedule between projects

    Quote Originally Posted by Titan View Post
    Are you using a shared parameter in the schedule that might not be in all of the projects?
    To & From parameters are hard coded into the Door & Window family categories, when these items get loaded into the project environment. Thus, users are unable to control them.

    Etboards17,

    Have you checked the Phase that the schedule is set to? Are they the same for each project? Do you have Room elements in your model, or are you using Spaces? In 2014, Spaces are not available in door schedules.

  8. #8
    Active Member
    Join Date
    2008-04
    Posts
    86
    Login to Give a bone
    0

    Default Re: Transfer Schedule between projects

    Same Phase as 'copy-from' project.
    Room elements are present.
    Not using spaces.

  9. #9
    Revit Forum Manager Steve_Stafford's Avatar
    Join Date
    2001-12
    Location
    Irvine, CA
    Posts
    7,567
    Login to Give a bone
    0

    Default Re: Transfer Schedule between projects

    Just tried it with Revit 2015 Web update 3, worked fine.

Similar Threads

  1. 2014: RFA bulk transfer between projects
    By jagostinho in forum Revit Architecture - Families
    Replies: 2
    Last Post: 2014-11-17, 02:50 PM
  2. Transfer filter with another projects
    By swapr78 in forum Revit MEP - General
    Replies: 1
    Last Post: 2011-04-20, 01:15 PM
  3. What's the best way to transfer Families between projects?
    By mhenderson in forum Revit Architecture - Families
    Replies: 8
    Last Post: 2010-08-20, 03:44 PM
  4. Transfer Program Information between Projects (Room Schedule)
    By rganter.97143 in forum Revit Architecture - General
    Replies: 3
    Last Post: 2009-01-22, 04:20 PM
  5. Legends Transfer between projects
    By D_Driver in forum Revit - Platform
    Replies: 2
    Last Post: 2008-05-14, 04:50 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •