Originally Posted by
jessica.146534
I don't know if this is the right way to do this, but what I've done is use a Filter in the Keynote schedule. I work with renovations so I have demolition keynotes and I put a "D" in front of the key number and then filter by "Key Value" "contains" "D" and it works. The problem with this is that you can't have 2 keynotes with the same number. For example you could have plan keynotes 1-19, section keynotes 20-39. and elevation keynotes 40-59 or whatever numbering system works for you.
Does anyone else have other suggestions?