I have two questions:
1. How can I put my electrical information into the mechanical equipment (MOP, MCA, FLA, and Voltage) so that it will pull through to my electrical information? The load can be pulled through from the mechanical equipment by just having a formula to calculate the load, but it does not look there is a parameter to be put in place for breaker size and a parameter can not be added to the electrical connection. Is there a way to pull the MOP through once mechanical has placed all their information in say a RTU, or if something changes last minute then it will be updated in my schedules as well? I know the load would be, but what about the circuit breaker?
2. I am trying to get the circuit breaker size for any piece of equipment to come through and show the correct size in the panel schedule, that way you do not have to always resize the breaker information for each piece of equipment. The panel schedule sizes the circuit breaker off a parameter called "Rating", which I have found no way to link to. Rating can be found by going to a device and then going to the tab at the top called "Electrical Circuits" and then look under "Properties". If I change the number under "Rating" then my circuit breaker and wire size will change in my panel schedule, I just want to know if there is a way to link to this information or if you have to always go to the "Rating" and change it every time, and this is also a global change.