    Default Concrete Column Schedule

    I was looking into using the column schedule for concrete columns and came across this problem where the concrete column is omitted where the slab intersects it.

    I have attached a real ROUGH example of what I am talking about.

    I have found on this forum that some are using openings in the slab to overcome this, but now that we are in 2011, I was hoping someone had come up with a better solution.

    I wonder if there is a better way to do this with just text, and omit the column graphic altogether.

    Anyone?
    Attached Files Attached Files

  2. #2
    I could stop if I wanted to
    Join Date
    2007-03
    Location
    Melbourne, Australia
    Posts
    278

    Default Re: Concrete Column Schedule

    The graphical schedule will simply show the column as it is in the model

    You need to unjoin geometry for the column from the floor/beam to see the full column

    If your column family is set to concrete it will automatically join to the slab and the slab takes priority to the column leaving you with the result you are getting.

    You can either unjoin the column manually after placing, or consider changing the material type in the family, however this may affect analyis linking if you are using it

  3. #3
    Super Moderator david_peterson's Avatar
    Join Date
    2002-09
    Location
    Madison, WI
    Posts
    4,440

    Default Re: Concrete Column Schedule

    Actually, because slabs will always cut the column, and walls will always cut the column, you have to cut the slab around every column. If you un-join the slab, it will un-join from everything and you're framing will look all screwed up.
    Best way I've solved the problem. Create it in Acad. The GCS was never really meant to be placed on a sheet. It was meant for more of a self check I believe. Hence no option to add text. Tags only.
    Dave Peterson

    Acad 2012 - Revit Structure 2013 - Z220 - Win 7 64 - i7-3770 3.4GHz 32GB Ram
    "The more you know, the less you know, because the more you know you don't know". --M. Lin

Similar Threads

  1. steel column on top of concrete column
    By szaky007333406 in forum Robot Structural Analysis
    Replies: 4
    Last Post: 2011-06-27, 12:12 PM
  2. Material cut from concrete column in elevated column schedule
    By khanson-3b in forum Revit Structure - General
    Replies: 1
    Last Post: 2011-04-10, 06:24 AM
  3. Graphical Column Schedule (Concrete)
    By david_peterson in forum Revit Structure - General
    Replies: 6
    Last Post: 2010-04-30, 03:48 PM
  4. Trouble Attaching Steel Column to Concrete Column Below
    By amiller.223744 in forum Revit Structure - General
    Replies: 1
    Last Post: 2009-09-02, 03:13 PM
  5. Graphic Column Schedule for Concrete Columns/Origin
    By djn in forum Revit Structure - General
    Replies: 3
    Last Post: 2007-12-13, 02:08 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •