Hi,

I would like to schedule my linked revit files. Is this possible?
Scheduling their linked sheets for the master sheet list wasn't a problem. But now all I would like to do is schedule them to get at least number counts e.g. the amount of each type of revit link.
(Its a huge site with lots of type a, b, c housing.

Cheers!