I'm having a really hard time here. LAM (Lord And Master) doesn't know how to take "No" for an answer. Trust me.
One word: Larry. Long story. www.twitter.com/projectsauron
Here's the problem. I can't make Roof by Face for this Mass. But walls work just fine. But I need to use a Roof so I can attach walls to the top and bottom. Anyway - I'll use walls in the meantime. But manual profile editing for each wall will not go over well.
The other minions are getting restless and I was the one that insisted we use Revit on this project. Bottom Line: We must be done 6 months (well before the next UN Summit), cause it'll take at least that long for the particle separators to get delivered from eBay and assembled and tested - probably on a few Somalia pirate ships (or a Poseidon class sub if it happens to get too close).
Suggestions welcome.
Thanks -
Mort