Just want to make sure I'm not missing something. We have a large existing facility with a small renovation in one area, and then a large addition on the opposite side of the facility, which are being completed as separate bid packages. I have each building/project as separate Revit files, and have them linked together. Do I still have to place Room Bounding lines in the Addition file where the existing walls occur in the other Revit file?
Seems odd that we can do so much with linked files - room tagging, scheduling, workset control, etc. but can't make the 3D geometry in the linked file be room bounding in the host file.