    Woo! Hoo! my 1st post
    Join Date
    2012-05
    Location
    Richmond, VA
    Posts
    1

    Question Revit Keynoting - Numbering System

    I have 5 years experience and a strong understanding of Revit’s Keynoting tool. I am now at a new firm and assisting them with implementing keynoting. Currently they are using generic annotations / note blocks to apply sheet/keyed notes.

    In my past experience, I have used the “By Keynote” numbering method, with the first character relating to the spec section, and the second being the unique identifier, which is random, based on the order in which they were created.
    “Instruction” notes such as, “Align” would fall under Division 1 – notes numbered 1.1, 1.2, 1.3 and so on.
    Demolition notes would fall under Division 2. To me, this system makes a lot of sense as there is a logical grouping of elements, one numbering system can be used throughout the entire project, yet it is simpler than using a system based on the entire CSI Masterformat, such as the sample file included with Revit. Below is a shortened version of what a typical keynote txt file under this system would look like.

    My question is – what other keynote numbering/grouping systems are people using out there? Any thoughts on tweaking the method I’ve described? I have heard of firms grouping their keynotes by Floor Plans, Reflected Ceiling Plans, Elevations, etc. What I do not like about a system such as that is what happens when you want to keynote the same element on a floor plan, as well as an elevation or section. I would prefer to stick with the By Keynote numbering system, as opposed to “By Sheet,” but am open to all suggestions.


    D1 EXISTING TO REMAIN. 2
    D2 REMOVE WALL AS REQUIRED FOR NEW CONSTRUCTION 2
    D3 REMOVE PLUMBING FIXTURES COMPLETE. SEE PLUMBING DWGS FOR ADDITIONAL INFORMATION. 2
    D4 REMOVE CONCRETE TIERED FLOOR COMPLETE AND EXCAVATE. 2

    3.1 CONCRETE FOOTING. SEE STRUCT. DWG'S 3
    3.2 CONCRETE SLAB-ON-GRADE. SEE STRUCT' DWG'S 3
    3.3 WATERSTOP 3
    3.4 PRE-CAST COPING 3
    3.5 COMPOSITE CONCRETE DECK. SEE STRUCT' DWG'S 3
    3.6 PRECAST CONCRETE LINTEL 3
    3.7 PRECAST CONCRETE SILL 3
    3.8 C.I.P. CONCRETE BASE 3
    3.9 CONCRETE PLATFORM, FINISH AS SCHEDULED 3
    3.10 CONCRETE ELEVATOR SUMP PIT 3

    4.1 BRICK CAVITY WALL, NORMAN BRICK 4
    4.2 BRICK CAVITY WALL, STANDARD BRICK 4
    4.3 GROUND FACE CMU VENEER 4
    4.4 GROUND FACE CMU SILL 4
    4.5 MASONRY EXPANSION JOINT 4
    4.6 THIN BRICK VENEER 4
    4.7 REINFORCED CMU BEARING WALL. SEE STRUCT. DWG'S 4
    4.8 CAVITY DRAINAGE MESH 4
    4.9 WEEP HOLE 4
    4.10 GROUT 4

    5.1 STRUCTURAL STEEL. SEE STRUCT. DWG'S 5
    5.2 GLASS AND STAINLESS STEEL GUARDRAIL ASSEMBLY WITH STAINLESS STEEL HANDRAIL 5
    5.3 GALV. STEEL SHELF ANGLE. SEE STRUCT. DWG'S 5
    5.4 WALL MOUNTED ROOF ACCESS LADDER 5
    5.5 ELEVATOR PIT ACCESS LADDER 5
    5.6 GALV. PRECAST CONCRETE ANCHOR BY PRECAST MFR. 5
    5.7 COLD FORMED METAL FRAMING 5
    5.8 CONC. FILLED METAL PAN STAIR 5
    5.9 BLOCKING AS REQUIRED 5
    5.10 METAL DECK 5

    6.1 5/8" PLYWOOD SHEATHING 6
    6.2 GLASS AND CONCRETE COUNTERTOP (SS-1) 6
    6.3 WOOD VENEER MILLWORK, SEE ELEVATIONS 6
    6.4 WOOD VENEER MILLWORK DOOR (WD-1) 6
    6.5 PLASTIC LAMINATE MILLWORK 6
    6.6 SOLID WOOD BASE TO MATCH ADJACENT PANEL 6
    6.7 WOOD VENEER MILLWORK (WD-1) 6
    6.8 WOOD VENEER MILLWORK (WD-2) 6
    6.9 CABINET FOR RECYCLING RECEPTACLES 6
    6.10 QUARTZ-BASED STONE COUNTERTOP (SS-2) 6
    6.11 WOOD BLOCKING 6

    7.1 MODIFIED BITUMINOUS MEMBRANE GREEN ROOFING SYSTEM 7
    7.2 MODIFIED BITUMINOUS MEMBRANE ROOFING WITH BALLAST 7
    7.3 8" x 10" THROUGH-WALL SCUPPER 7
    7.4 PREFINISHED ALUMINUM COPING 7
    7.5 FIBERGLASS-FACED GYPSUM COVER BOARD 7
    7.6 TAPERED RIGID INSULATION 7
    7.7 PREFINISHED METAL SOFFIT 7
    7.8 STANDING SEAM ZINC ROOFING 7
    7.9 ALUM. COMPOSITE MATERIAL PANEL 7
    7.10 SOFT JOINT AT RELIEVING ANGLE 7

    8.1 7-1/2" ALUM. CURTAIN WALL w/ 1" INSULATED GLAZING 8
    8.2 4-1/2" ALUM. STOREFRONT w/ 1" INSULATED GLAZING 8
    8.3 CURTAIN WALL LIGHT MONITOR 8
    8.4 MIRROR 8
    8.5 INTERIOR ALUMINUM STOREFRONT 8
    8.6 INSULATED SPANDREL GLAZING 8
    8.7 INSULATED VISION GLAZING 8
    8.8 1/2" CLEAR TEMPERED GLASS SMOKESTOP W/ CLEAR SEALANT AT JOINTS 8
    8.9 PREFINISHED ALUMINUM LOUVER 8
    8.10 OPERABLE WINDOW 8

    9.1 NON-LOAD-BEARING STEEL STUD FRAMING 9
    9.2 5/8" TYPE X GYPUSM WALLBOARD 9
    9.3 GYPUSM SHAFT LINER PANEL 9
    9.4 5/8" GYPSUM WALL BOARD 9
    9.5 PAINTED WALL AS SCHEDULED 9
    9.6 BASE AS SCHEDULED 9
    9.7 PORCELAIN TILE (T-1) 9
    9.8 PORCELAIN TILE (T-2) 9
    9.9 PORCELAIN WALL TILE (CTW-1) 9
    9.10 CEILING AS SCHEDULED 9

    10.1 MARKERBOARD 10
    10.2 TACKBOARD (TB-1) 10
    10.3 STAINLESS STEEL TOILET PARTITION 10
    10.4 OVERHEAD MOTORIZED OPERABLE PARTITION 10
    10.5 MFR. STD ALUMINUM MARKER TRAY 10
    10.6 SEMI-RECESSED FIRE EXTINGUISHER CABINET 10
    10.7 TOILET TISSUE ROLL DISPENSER 10
    10.8 SURFACE MOUNTED SEAT COVER DISPENSER 10
    10.9 SURFACE MOUNTED SANITARY NAPKIN DISPOSAL UNIT 10
    10.10 MFR. STD ALUMINUM TRIM 10

    11.1 REFRIGERATOR, BY OWNER 11
    11.2 VENDING MACHINE (NIC) 11
    11.3 PROJECTION SCREEN. SEE TECH. DWGS 11
    11.4 FLUID APPLIED PROJECTION SCREEN. SEE TECH. DWGS. PROVIDE LEVEL 5 GWB FINISH IN THESE LOCATIONS 11

    12.1 FLOOR GRILLE 12
    12.2 MOTORIZED ROLLER SHADE RS-1 12
    12.3 MANUAL ROLLER SHADE RS-2 12
    12.4 GWB ROLLER SHADE POCKET, SLOPE BOTTOM WITH WINDOW HEAD 12

    14.2 ELEVATOR DOOR/FRAME ASSEMBLY 14

    21.1 SPRINKLER HEADS AT SMOKE STOP, SEE FIRE PROTECTION DRAWINGS 21

    22.1 ROOF DRAIN, TYP. SEE PLUMBING DWGS 22
    22.2 TRENCH DRAIN 22
    22.3 PLUMBING FIXTURE. SEE PLUMBING DWGS 22
    22.4 ELECTRIC WATER COOLER. SEE PLUMBING DWGS 22
    22.5 ALUMINUM GUTTER 22
    22.6 CLAMPING RING 22
    22.7 SINK AS SCHEDULED, SEE PLUMBING DWGS 22
    22.8 RAIN LEADER, SEE PLUMBING DWGS 22
    22.9 SUMP PUMP, SEE PLUMBING DWGS 22

    23.1 ROOFTOP MECH. EQUIPMENT - SEE MECHANICAL DWGS 23
    23.2 CONTINUOUS FLOOR BAR GRILLE ON 2ND FLOOR ONLY. SEE MECHANICAL DWGS 23
    23.3 MECHANICAL DUCT, SEE MECHANICAL DWGS 23
    23.4 LINEAR SUPPLY SLOT, SEE MECHANICAL DWGS 23

    26.1 LIGHT FIXTURE AS SCHEDULED. SEE ELEC. DWGS 26
    26.2 STEP LIGHT FIXTURE. SEE ELEC DWGS 26
    26.3 WALL RECEPTACLE. SEE ELEC DWGS 26

    27.1 MONITOR. SEE TECH. DWGS 27
    27.2 CAMERA. SEE TECH. DWGS 27
    27.3 SPEAKER. SEE TECH . DWGS 27
    27.4 CEILING MOUNTED PROJECTOR. SEE TECH. DWGS 27
    27.5 ELECTRONIC WHITEBOARD. SEE TECH. DWGS 27
    27.6 RECESSED PROJECTOR MOUNTED ON ELECTRONI LIFT. SEE TECH. DWGS 27
    27.7 EQUIPMENT RACK, SEE TECH. DRAWINGS 27
    27.8 INTERCOM, CENTER IN ZINC PANEL 27

    28.1 KEY BOX 28
    28.2 FACP, SEE FIRE PROTECTION 28
    28.3 CARD READER 28

    31.1 GRADE VARIES 31

  2. #2
    Super Moderator david_peterson's Avatar
    Join Date
    2002-09
    Location
    Madison, WI
    Posts
    4,440

    Default Re: Revit Keynoting - Numbering System

    I've actually gone with letter and number designators since a lot of my note describe systems.
    BW1 - 18" thick basement wall reinforced with #6@12"oc each way each face
    FNDW1 - 18" thick foundation steam well reinf........
    SW1 - 12" thick shear wall reinf.......
    SCS1 - structural composite slab - 2"-20ga galv comp steel deck with 4 1/2" nw conc topping (6 1/2" total thickness) reinf w/ 6x6-W2.1xW2.1 WWR
    EPAD1 - 3 1/2" equipment pad - see 5/s-501 for detail.
    IPAD1 - 12" thick isolated equipment pad - see 6/s-501
    sog1 - 6" thick slab on grade reinf w/ xxxxxxx - see x/xxx
    So I kind of went with a what you call it method for labeling keynotes.
    Not sure it's the best way, but I'm not going with full specs number. All keynotes are user based and not tied (currently) to any family.
    Dave Peterson

    Acad 2012 - Revit Structure 2013 - Z220 - Win 7 64 - i7-3770 3.4GHz 32GB Ram
    "The more you know, the less you know, because the more you know you don't know". --M. Lin

  3. #3
    I could stop if I wanted to mthurnauer's Avatar
    Join Date
    2001-11
    Location
    Cincinnati, formerly Chicago
    Posts
    388

    Default Re: Revit Keynoting - Numbering System

    I like your system. The only comment I have is that I try to use Type Mark tags whenever possible. For example, you use keynotes for your bathroom equipment, but for that, I would use an equipment tag and then create a bathroom accessory schedule that would list the items, mfr, model, comments, etc. The same is true for other items such as tackboards, markerboards, etc. I like the added functionality of having type marks and schedules where applicable. Another item where this has been useful is for window roller shades, blinds, and drapes.

  4. #4
    Active Member
    Join Date
    2005-01
    Location
    Albuquerque New Mexico
    Posts
    52

    Default Re: Revit Keynoting - Numbering System

    My firm tends to follow the NCS keynote number is the full specification number pluse it's modifier(08 7000.A). These notes are basically Reference or material notes, and do not describe how to do anything such as "align". For descriptive note we use NCS's sheet keynotes which are numbered 1,2,3 etc. For the sheet keynotes we have developed three ways of doing this the first is to have a separate note block that can be scheduled. I've described this in my blog check it out. http://revittize.blogspot.com/2008/0...revistied.html

    The second is putting all descriptive keynotes in specification sections that are in division 1 such as demolition.
    The third is something my firm is currently testing where the discriptive notes are still with in the keynote file and numbered 1,2,3 but the keynote legend is filtered to seperate the sheet keynotes from the referance keynotes
    Mathew Miller
    SMPC Architects
    Albuquerque New Mexico
    http://revittize.blogspot.com/

Similar Threads

  1. Drawing Numbering System
    By jacksona in forum CAD Management - General
    Replies: 8
    Last Post: 2008-09-16, 02:10 AM
  2. Keynoting System Insulation - RAC 2008
    By myBIMhero in forum Revit Architecture - General
    Replies: 2
    Last Post: 2008-03-08, 11:42 PM
  3. Is their a Standardize Sheet Numbering System?
    By interceptor59 in forum Revit - In Practice
    Replies: 5
    Last Post: 2006-04-26, 03:07 PM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •