    Default Project North

    I have been drawing my project onto Revit topography facing true north. The building is actually rotated 15 degrees, and it's time to establish project north. My site consists of roads, sidewalks, parking etc. The building itself will be a link.

    I established a reference plane at the 15 degree angle and selected it to establish project north.

    • The parking spaces failed to rotate
    • the parking lot disappeared
    • the rest of the data rotated correctly


    For now, the file is a standalone. Worksets are not enabled, but I will have to share soon and I want project north established, because it makes most of the building orthogonal.
    "everything you know is wrong...." -FST

  2. #2
    I could stop if I wanted to
    Join Date
    2007-03
    Posts
    213

    Default Re: Project North

    You are supposed to draw orthogonally and THEN rotate the Real North, not draw non-orthogonally.

    As for the steps to rotate the project North, You are not supposed to rotate the project per say. Here are some step by step instructions, is this what you did?

    • On a Plan or Site Plan, change the View's Orientation to "True North"
    • Click Manage tab Project Location panel > Position drop-down > Rotate True North.
    • Rotate the project to it's True North.
    • Change the view's orientation back to "Project North".

  3. #3
    I could stop if I wanted to Revitaoist's Avatar
    Join Date
    2009-11
    Posts
    277

    Default Re: Project North

    If the building is a link, you should be doing the CD's in the building file. Set True North in the building file per Samuel's post then link in the site.
    ICC Building Plans Examiner
    CABEC Energy Plans Examiner
    Licensed Building Contractor
    Architectural Drafter

  4. #4
    Certified AUGI Addict patricks's Avatar
    Join Date
    2004-06
    Location
    Memphis TN area
    Posts
    6,701

    Default Re: Project North

    I do it the other way. Establish True North in the site file, either by Rotate True North or acquiring coordinates from a linked CAD survey file. Then bring in the building and position as needed. Then publish coordinates to the building file. After all that I go in the building file and bring in the site file via Shared Coordinates and everything lines up just right, with True and Project North defined as it should be.
    Intern Architect, BIM Manager/Coordinator
    AERC, PLLC
    Hernando, Mississippi

    Revit - all up in your voxel space

Similar Threads

  1. The Moving Linked CAD file (Project North True North)
    By mkim in forum Revit Architecture - General
    Replies: 6
    Last Post: 2013-02-28, 08:59 AM
  2. Losing colours between project north and true north
    By dominicsy in forum Revit Architecture - General
    Replies: 0
    Last Post: 2010-02-25, 04:08 PM
  3. True North Rotate and Project North Alignment
    By Firmso in forum Revit Architecture - General
    Replies: 6
    Last Post: 2007-06-13, 05:11 AM
  4. Model Lines - True North/Project North
    By funkman in forum Revit Architecture - General
    Replies: 2
    Last Post: 2005-02-02, 07:17 AM
  5. Shadows in Revit 7.0 - True north, Project north
    By Tobie in forum Revit Architecture - General
    Replies: 3
    Last Post: 2004-12-14, 10:38 PM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •