What's the proper procedure for placing the buiding topo/site plan Revit file after the Building model has already been started? I created Topo from a Autocad survey that we had in a seperate Revit File. I want to link it into my building file. Should I place it in Center to Center, and then physically move it into place to line up with the building? Should I Publish Coordinates to the site file or should I acquire coordinates from the site?

Thanks