Summary: We HAVE to be able to manipulate how sheets are shown on the drawing list, not just in alphabetical order according to sheet number.
Description: How is anyone supposed to use this feature out of the box? There is no way to manipulate how the sheets are displayed in the drawing list, besides arranging them in alphabetical order. We have linked S and MEP models that have to show up here too. In order for this to work, we have to add shared parameters to fill in fields for "discipline" and "drawing order". These should be system parameters, or there should be more control over the formatting of these schedules.
Product and Feature: Revit Architecture - Annotation Tools
Submitted By: Jonathan Hicks on 08/28/2012