Results 1 to 2 of 2

Thread: Electrical Panel schedules

  1. #1
    Member
    Join Date
    2012-11
    Location
    Phoenix Arizona
    Posts
    5
    Login to Give a bone
    0

    Default Electrical Panel schedules

    I need to make an electrical panel schedule that only has 30 breaker spots. If I change the amount of single pole breakers in the panel, it does not change the panel schedule. Does anyone know how to edit these to make them less than 42 circuit?

  2. #2
    All AUGI, all the time CADastrophe's Avatar
    Join Date
    2012-01
    Location
    Site of the next CADaclysm
    Posts
    813
    Login to Give a bone
    0

    Default Re: Electrical Panel schedules

    Manage tab » Panel Schedule Templates ▼ Edit a Template. Open your Panel Template and then go to Set Template Options on the top left on the Ribbon. Under Size, set it to "Variable based on maximum number of one-pole breakers". You will likely have to refresh the existing Panel Schedule Views by opening them, clicking Change Template on the Ribbon, and selecting that same Template.

Similar Threads

  1. 2013: Electrical Panel schedules
    By LJPazzani in forum Revit MEP - General
    Replies: 6
    Last Post: 2013-05-10, 03:41 PM
  2. Electrical Panel Schedules
    By HD_119 in forum Revit MEP - General
    Replies: 6
    Last Post: 2012-04-02, 07:52 PM
  3. Electrical Panel Schedules
    By Sparky in forum Revit MEP - General
    Replies: 2
    Last Post: 2011-09-02, 05:05 PM
  4. Electrical Panel Schedules - What are you doing?
    By Tyveka in forum Revit MEP - General
    Replies: 18
    Last Post: 2008-12-12, 04:13 PM
  5. Electrical Panel Schedules
    By Mottiqua in forum Revit MEP - General
    Replies: 6
    Last Post: 2007-04-06, 05:31 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •