This should be an easy one. In the material take off schedule, I want to make a calculated value parameter which looks at the square footage of the gypsum board and looks at my cost per square foot parameter and multiplies them both. I have created an area*cost parameter called total cost but I always receive an Inconsistent Units result
thanks in advance
bob