    That is to say, we have a project with three phases and would like to show each phase using different display settings. Original historic building, old addition, demo, new work. We can't seam to be able to show each phase with a different linetype/hatch.

    Ultimately, what we would really like to to is turn off the wall hatch for the original building but leave it on for the next two phases and have the walls half toned for the first two phases but normal for the latest.

    On a similar note, we have a job that needs Existing, Existing not in contract, Demo, and New. We would like to be able to define "In Contract" regions, and "Not in Contract" regions which would let us control the visibility of each separately. In Contract would have medium or fine detailing (depending on the sheet) and Not in Contract would always be course.

    This would also be useful to us for tenant build out projects where we have Base Building (Not in Contract, NIC), Demo and New.

  2. #2
    AUGI Addict aggockel50321's Avatar
    Join Date
    2003-05
    Location
    Waterville, Maine
    Posts
    1,748
    Login to Give a bone
    0

    Default Re: How to you create a timeline in your drawings?

    Play with the phase filters & graphic overides & you should be able to achieve what you want, by setting up some custom phase filters.

    As far as controlling visibllity with phases, you can if the phase you want not to see is after the phase you view is set to.

    You might be better off to use worksets to control visibility of "in contract" and "not in contract" stuff.

  3. #3
    AUGI Addict sfaust's Avatar
    Join Date
    2004-01
    Location
    Littleton, CO (Denver Metro)
    Posts
    1,535
    Login to Give a bone
    0

    Default Re: How to you create a timeline in your drawings?

    Phase filters and graphic overrides will get you most of the way there, but you still can only display 4 types in a single plan (Existing, Demo, Temoporary, and New). Take out existing and temporary since you don't want to be domolishing everything, and you only have existing and new.

    The best solution that I can come up with is using overlayed plans. Create one plan in the "old addition" phase using a phase filter (which you will probably have to create that shows existing and new construction, both overridden. Then make another plan that is set to "show demo and new" in the "new work" phase. Overlay the plans on a sheet and you will have all the representations you need. The only problem is the things that are demolished will show up as new on the first plan, so there is conflicting info. As long as you drag the plans onto the sheet in order of chrononology I think you should be ok...

    See attached file for an example.
    Attached Files Attached Files

Similar Threads

  1. Create surface from 3d Cad drawings
    By Wish List System in forum Civil 3D Wish List
    Replies: 2
    Last Post: 2013-10-28, 08:29 PM
  2. Create consultant's drawings list
    By revit.wishlist1942 in forum Revit Architecture - Wish List
    Replies: 0
    Last Post: 2008-10-21, 12:53 PM
  3. Can I create complete site drawings?
    By Tom Phillips in forum Revit Architecture - General
    Replies: 3
    Last Post: 2008-02-27, 08:16 PM
  4. Does CAD create a log of changed information on drawings?
    By BRENDA_GZZ_GOMEZ in forum AutoCAD General
    Replies: 10
    Last Post: 2007-05-24, 03:12 PM
  5. create xref drawings?
    By LLAW3224 in forum AutoLISP
    Replies: 1
    Last Post: 2005-05-10, 02:51 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •