Page 1 of 3 123 LastLast
Results 1 to 10 of 21

Thread: Multiply Schedule field values

  1. #1
    Member
    Join Date
    2012-01
    Posts
    47
    Login to Give a bone
    0

    Default Multiply Schedule field values

    Hi all,

    I have created a schedule of some parameters of a custom family that I made. Among those are Length and Width. Instead of creating a field for Area, which gives me the total surface area of my object, I just want the Width X Length. I attempted to create a Calculated Value, which was Width*Length, but I get this error: "The following is not a valid schedule field: Width", even though I selected it from the list of available fields by clicking on the box with 3 dots. Anyone come across this, or know a workaround? Does it have something to do with it being a shared parameter from the family I created?

    Thanks,
    JP

  2. #2
    All AUGI, all the time CADastrophe's Avatar
    Join Date
    2012-01
    Location
    Site of the next CADaclysm
    Posts
    813
    Login to Give a bone
    0

    Default Re: Multiply Schedule field values

    Can you post a screencap of the dialog which is producing this error and/or attach your family file here?

  3. #3

  4. #4
    All AUGI, all the time CADastrophe's Avatar
    Join Date
    2012-01
    Location
    Site of the next CADaclysm
    Posts
    813
    Login to Give a bone
    0

    Default Re: Multiply Schedule field values

    The problem is that you used a "-" in the parameter name. Revit interprets that as "Width" MINUS "Shared", hence the error. You will have to use a different parameter name; either omit the "-" or use a special dash from the Character Map (such as "En Dash", alt+0150).

  5. #5
    Member
    Join Date
    2012-01
    Posts
    47
    Login to Give a bone
    0

    Default Re: Multiply Schedule field values

    shadow box.rvt

    And here's my file.

  6. #6
    Member
    Join Date
    2012-01
    Posts
    47
    Login to Give a bone
    0

    Default Re: Multiply Schedule field values

    Quote Originally Posted by CADastrophe View Post
    The problem is that you used a "-" in the parameter name. Revit interprets that as "Width" MINUS "Shared", hence the error. You will have to use a different parameter name; either omit the "-" or use a special dash from the Character Map (such as "En Dash", alt+0150).
    Ok, that's good to know. These are shared parameters, and going into the editing feature I can't seem to rename it. If I delete it and create a new one I will have to re-do all my families. Am I missing something?

  7. #7
    All AUGI, all the time CADastrophe's Avatar
    Join Date
    2012-01
    Location
    Site of the next CADaclysm
    Posts
    813
    Login to Give a bone
    0

    Default Re: Multiply Schedule field values

    Quote Originally Posted by Spork View Post
    Ok, that's good to know. These are shared parameters, and going into the editing feature I can't seem to rename it. If I delete it and create a new one I will have to re-do all my families. Am I missing something?
    Unfortunately, I don't think you are missing anything - you cannot simply rename a Shared Parameter. However, there may be a way I don't know of (such as a parameter add-in) so search the forums and perhaps you'll find something. Good luck!

  8. #8
    Member
    Join Date
    2012-01
    Posts
    47
    Login to Give a bone
    0

    Default Re: Multiply Schedule field values

    I just made a new one without the dash, it wasn't too hard to switch. It works!

    I still can't get those fields to calculate totals, though.

  9. #9
    Member
    Join Date
    2012-01
    Posts
    47
    Login to Give a bone
    0

    Default Re: Multiply Schedule field values

    Duplicate post, sorry
    Last edited by Spork; 2013-04-05 at 03:14 AM.

  10. #10
    All AUGI, all the time CADastrophe's Avatar
    Join Date
    2012-01
    Location
    Site of the next CADaclysm
    Posts
    813
    Login to Give a bone
    0

    Default Re: Multiply Schedule field values

    Quote Originally Posted by Spork View Post
    I just made a new one without the dash, it wasn't too hard to switch. It works!

    I still can't get those fields to calculate totals, though.
    Do you mean displaying a total Area for that entire Field?

Page 1 of 3 123 LastLast

Similar Threads

  1. Default field values
    By junkdiver in forum AutoCAD Fields
    Replies: 15
    Last Post: 2017-02-17, 01:06 PM
  2. Highlight field for multiple varying values
    By Wish List System in forum Revit Architecture - Wish List
    Replies: 0
    Last Post: 2014-11-13, 05:22 PM
  3. Replies: 1
    Last Post: 2013-06-08, 04:52 AM
  4. Field Values in Xref not Displaying Correctly
    By sifuentes in forum AutoCAD Fields
    Replies: 4
    Last Post: 2010-04-08, 03:22 PM
  5. object field values scales with VP?
    By randyspear in forum Dynamic Blocks - Technical
    Replies: 3
    Last Post: 2010-03-17, 03:26 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •