    Default Retain current values of Schedule cells when changing a Schedule Key parameter value back to (none)

    Summary: I wish I could change a Schedule Key parameter value back to (none) without the Revit Schedule losing all of the implied parameter values for that row.

    Description: Schedule Keys are great. But what would make Schedules even better is clarified in this example: I have 20 Classrooms. During the DD Phase, I apply my Schedule Key values to my Room Finish Schedule to populate the cells quickly and efficiently. During CD's, the Interior Designer decides that only one of the Classrooms needs to have the North Wall Finish changed to PTD-4 instead of the standard PTD-1. To do this, I change the Schedule Key value from CLASSROOM back to (none), but I wish all of the current values stayed as they were *instead of being cleared), and then I could use the drop down (or type in any text) to modify the North Wall Finish value for that Room and be done, instead of having to re-input every value that was being controlled by the Key.

    Product and Feature: Revit Architecture - Other

    Submitted By: Scott Ludwig on 06/06/2013


  2. #2
    Wish List Administration
    Join Date
    2011-08
    Posts
    4,581

    Exclamation Re: Retain current values of Schedule cells when changing a Schedule Key parameter value back to (none)

    Retain current values of Schedule cells when changing a Schedule Key parameter value back to (none)

    Summary: I wish I could change a Schedule Key parameter value back to (none) without the Revit Schedule losing all of the implied parameter values for that row.

    Description: Schedule Keys are great. But what would make Schedules even better is clarified in this example: I have 20 Classrooms. During the DD Phase, I apply my Schedule Key values to my Room Finish Schedule to populate the cells quickly and efficiently. During CD's, the Interior Designer decides that only one of the Classrooms needs to have the North Wall Finish changed to PTD-4 instead of the standard PTD-1. To do this, I change the Schedule Key value from CLASSROOM back to (none), but I wish all of the current values stayed as they were *instead of being cleared), and then I could use the drop down (or type in any text) to modify the North Wall Finish value for that Room and be done, instead of having to re-input every value that was being controlled by the Key.

    Product and Feature: Revit Architecture - Other

    Submitted By: Scott Ludwig on 06/06/2013


Similar Threads

  1. Can't manually enter shared parameter values in a room schedule
    By gunning in forum Revit Architecture - General
    Replies: 3
    Last Post: 2007-05-16, 06:57 PM
  2. Working with schedule cells
    By E-Key in forum Revit Architecture - Wish List
    Replies: 0
    Last Post: 2005-08-22, 02:12 PM
  3. Import excel cells within Revit schedule
    By valamar2005-site in forum Revit - API
    Replies: 7
    Last Post: 2005-07-02, 03:28 AM
  4. Changing Clipped View Front & Back Values
    By 3D Jack in forum AutoLISP
    Replies: 2
    Last Post: 2005-07-01, 03:54 AM
  5. Changing Height of Schedule Table Cells
    By photography67836 in forum Revit Architecture - General
    Replies: 3
    Last Post: 2005-01-20, 11:10 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •