I'm creating our standard details in a separate project file using drafting views. Then when we need a detail for a project we can create a drafting view in the project and use the Insert From File command and bring the needed detail in from this separate file. I've run into a small issue. Some of the standard details reference blow-ups that are other standard details. I can't figure out how to get the callouts to work. I tried using a callout to reference the blow-up drafting view in the standard detail in the separate file and then bringing both details over to a new project with the hopes that the callout would come across too but it doesn't. Right now I've settled on creating a big bold red note and dashed line where the callout should be to remind the person bringing the details across to create the reference and callout. Then they can erase the red note and lines. Is there any way to reference the blow-up in the standard details file and have the callout appear correctly when I bring the 2 details into the project?
Thanks for any advice.