Why is it that the format for the schedules does not allow me to add a "row" where I want (for instance between two rows in the middle of the schedule)?... it only adds a "row" at the bottom of the very bottom of the schedule.
|
Why is it that the format for the schedules does not allow me to add a "row" where I want (for instance between two rows in the middle of the schedule)?... it only adds a "row" at the bottom of the very bottom of the schedule.
Schedule use an alphabetical order to be arrange.