Dear colleagues,
I am working now in 3 similar Buildings (similarity up to 70%),
My Question is how to do similar works one time in one building, and, transfer it to the two other buildings without repeating it.
I try to model them in external file and link it into the three building files, but in this way, we can't connect linked elements with current model elements.
Also, I try to take similar works as a group in the first building and, copy and paste it into the two other buildings, but this way produced a problem in wiring system as follows:
Lighting fixtures, wiring, panels, switches are completely pasted but they are not reading wiring system which means that we will create wiring system again.
Also, this means that we will rework some of similar works.
I would like to refer that there is about 30% of different works between the three buildings.
Again, my Question is how to do similar works one time in one building, and, transfer it to the two other buildings without repeating it.