    Question Navisworks 2014 Ductwork Takeoffs discrepancies

    I hope someone in the forum has had some experience with the following.

    I was recently asked to generate a ductwork takeoff on a sub-consultants model just to double check their numbers. This task was first done in Revit 2014 via the ductwork schedule. The only things I included in the schedule were: Width, Height, Length, and Area. The total square footage calculated by Revit, excluding all accessories and fittings, was ~370K

    After seeing what Revit had calculated, I wanted to check if I could replicate the same results in Navisworks. I created a custom Item Catalog under "Metals," and then generated it's associated Resource Catalog. I modified the Volume Resource Calculation (ModelWidght*ModelHeight) to get my area and then used the Selection Tree to add my ductwork to the Quantification Workbook. Once everything was complete, I exported the quantities to excel and check the total ductwork square footage. To my surprise the number was ~649K.

    It's still unclear to me as to how the two numbers can be so different. I thought Navisworks simply reads whatever information is exported from Revit. However, this leads me to believe otherwise. One more piece of interesting information; the total Linear Feet Number is the same in both Revit and Navisworks: 37K

    Any light anyone can shed on this is greatly appreciated.

    Thank you,

  2. #2
    Certifiable AUGI Addict dhurtubise's Avatar
    Join Date
    2005-07
    Location
    Somewhere in the BIM world
    Posts
    3,792
    Login to Give a bone
    0

    Default Re: Navisworks 2014 Ductwork Takeoffs discrepancies

    Did you first check if you have the same amount of element in each schedule?

  3. #3
    Member
    Join Date
    2009-04
    Location
    London, UK
    Posts
    28
    Login to Give a bone
    0

    Default Re: Navisworks 2014 Ductwork Takeoffs discrepancies

    I wonder did you ever figure out what was happening? Also if anyone else has come across differences between Revit and Navisworks quantities? I have compared two structural model take off results and come up with differences on both projects which has led me to completely re-evaluate my approach with Navisworks QTO

  4. #4
    Member
    Join Date
    2010-04
    Location
    Chennai, India
    Posts
    3
    Login to Give a bone
    0

    Default Re: Navisworks 2014 Ductwork Takeoffs discrepancies

    IMO, the take-off from Navisworks quantification is accurate than Revit. This is because, We could able to identify the elements on the Navisworks to verify it.
    By the way, How would you take-off duct fittings?

Similar Threads

  1. 2014: Revit MEP 2014 - Ductwork Lining and Insulation/Spigots disappering
    By StevieD in forum Revit MEP - General
    Replies: 2
    Last Post: 2014-08-04, 06:28 AM
  2. 2014: Navisworks Exporter 2014
    By jcurtis367595 in forum Revit MEP - General
    Replies: 6
    Last Post: 2014-02-06, 05:13 PM
  3. 2014: Revit 2014 can't find Oval Ductwork System Family
    By kevin.yorston444974 in forum Revit MEP - General
    Replies: 3
    Last Post: 2013-11-22, 09:21 PM
  4. 2014: Navisworks 2014 on Windows 8
    By calladj in forum NavisWorks - General
    Replies: 0
    Last Post: 2013-09-03, 11:15 AM
  5. 2014: revit 2014 to navisworks 2014
    By vinnygolfer in forum NavisWorks - General
    Replies: 2
    Last Post: 2013-08-19, 08:02 PM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •