Residential Subdivision will have 3 phases. Is the best practice for this to create (3) Sites or just (3) proposed surfaces?
|
Residential Subdivision will have 3 phases. Is the best practice for this to create (3) Sites or just (3) proposed surfaces?
My inclination would be to go with 3 finish grades. in theory, when the GC is doing Phase 2 construction a year or six down the road, what was PH 1 FG is now the existing grade of the site
"How we think determines what we do, and what we do determines what we get."
Sincpac C3D ~ Autodesk Exchange Apps
Computer Specs:
Dell Precision 3660, Core i9-12900K 5.2GHz, 64GB DDR5 RAM, PCIe 4.0 M.2 SSD (RAID 0), 16GB NVIDIA RTX A4000
yeah, and if phase 3 is six years down the road, and a hurricane or two comes by -- may need to update the old ph 1 surface with fresh survey data to have a useful eg at that time