Results 1 to 2 of 2

Thread: Wires show in multiples phases or in existing and new construction

  1. #1
    Wish List Administration
    Join Date
    2011-08
    Posts
    4,581
    Login to Give a bone
    0

    Default Wires show in multiples phases or in existing and new construction

    Summary: Wires drawn in Phase 1 should show in Phase 2 as existing. Existing Wires should show in New Construction Views as existing

    Description: Wires should show between multiple phases and views.

    Product and Feature: Revit MEP - MEP Electrical Wiring - (Electrical)

    Submitted By: Daniel Gunter on 07/28/2015


  2. #2
    Revit Forum Manager Steve_Stafford's Avatar
    Join Date
    2001-12
    Location
    Irvine, CA
    Posts
    7,567
    Login to Give a bone
    0

    Default Re: Wires show in multiples phases or in existing and new construction

    Since wires are annotation, view specific...they can show in any view, any phase...but you've got to place them and the devices you intend to attach them to need to be present.

Similar Threads

  1. 2013: Is their a way only to show wire size tags for wires #10 and above?
    By bulletproofx352446 in forum Revit MEP - General
    Replies: 0
    Last Post: 2013-01-16, 08:42 PM
  2. Replies: 4
    Last Post: 2012-06-25, 09:59 PM
  3. Easiest way to make existing phase construction show up shaded solid grey
    By mthurnauer in forum Revit Architecture - General
    Replies: 1
    Last Post: 2010-03-31, 07:27 PM
  4. Show wall construction lines in existing walls?
    By AJGKennedy in forum Revit Architecture - General
    Replies: 8
    Last Post: 2009-10-29, 01:05 PM
  5. Phases of construction.........
    By aliya14 in forum Revit Architecture - General
    Replies: 7
    Last Post: 2006-12-28, 07:09 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •