Was wondering if any one had experience with creating a multi-leader that has a Callout block that references a Sheet View (Detail Number / Sheet Number). We often create these by making a multileader without any text then copy in a detail reference, but it would be great if we could do this on the fly so if I need to move the multi-leader it would operate as one unit rather than two. I have done the callout block as a multileader style before but don't like that it does not update if the detail number or sheet changes.

Thanks for your help!