    Default Revit Schedule Field value problem

    I am working with Revit 2016 and trying to create a Structural schedule. I have been told to create a column for rebar and the value is #4 @ 1'-0" - but when I enter that value in the schedule field I get an error saying I need to start a formula with the = sign, and if I put an = sign it tells me this is not a formula. So how do I specify that this is a TEXT string and get it entered into the schedule? Any help would be appreciated

  2. #2
    Certifiable AUGI Addict Dimitri Harvalias's Avatar
    Join Date
    2015-12
    Location
    Vancouver, BC Canada
    Posts
    3,753
    Login to Give a bone
    0

    Default Re: Revit Schedule Field value problem

    Welcome to the forums.
    Make sure when you are defining the parameter that you set the correct parameter type (number, length, text etc). For a value such as this Text is the only option that will work.

Similar Threads

  1. 2014: Revit Structure 2014 beam schedule problem
    By simon.bannister in forum Revit Structure - General
    Replies: 1
    Last Post: 2014-04-18, 03:31 PM
  2. add extra count field to revit schedule
    By franciscorefosco in forum Revit Architecture - General
    Replies: 4
    Last Post: 2011-08-31, 05:42 PM
  3. calculated value schedule field
    By gdb in forum Revit Architecture - General
    Replies: 6
    Last Post: 2009-07-06, 02:47 PM
  4. NEW FIELD IN REVISION SCHEDULE
    By gmancilla in forum Revit Architecture - General
    Replies: 2
    Last Post: 2008-07-31, 06:14 PM
  5. can a field be used in a door schedule?
    By khayes.107206 in forum AutoCAD Fields
    Replies: 10
    Last Post: 2006-07-17, 04:01 PM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •