Thread: Worksets or Multiple Models for Phasing

  1. #1
    Login to Give a bone
    0

    Post Worksets or Multiple Models for Phasing

    I have a project that has multiple phases with each phase creating a separate set of documents for permitting and bidding. Currently there are 2 phases and Phase 1 is complete. I need to begin Phase 2 and don't want to make any erroneous changes to Phase 1.
    Should I use worksets or multiple models? Or a combination of both? I am fairly new to Revit and venturing into deeper waters... Suggestions are greatly appreciated.

  2. #2
    Super Moderator CAtDiva's Avatar
    Join Date
    2015-10
    Location
    Where pedals spin to move wheels
    Posts
    442
    Login to Give a bone
    0

    Default Re: Worksets or Multiple Models for Phasing

    Quote Originally Posted by johnrwatkins51741243 View Post
    I have a project that has multiple phases with each phase creating a separate set of documents for permitting and bidding. Currently there are 2 phases and Phase 1 is complete. I need to begin Phase 2 and don't want to make any erroneous changes to Phase 1.
    Should I use worksets or multiple models? Or a combination of both? I am fairly new to Revit and venturing into deeper waters... Suggestions are greatly appreciated.
    I would not use worksets for this. I might consider using a separate model if: a) There is little to no expectation that components/objects from Phase 1 will need to be modified for work related to Phase 2; and b) I have to use the exact same sheet numbering system for my drawings (Revit does not allow duplicate sheet numbers).

    You didn't mention using Revit Phasing. I would highly suggest looking into this. The only caveat is that your sheet numbers have to be unique, so perhaps a pre-fix of PH1- or PH2-. That might be a good idea anyway to mitigate confusion of which drawing set is being referenced.

  3. #3
    Login to Give a bone
    0

    Default Re: Worksets or Multiple Models for Phasing

    Thanks!
    I think what I will do is transfer standards to a new project (a new model) and link the previous model. I have created phase filters so that I can show only what I want.

Similar Threads

  1. Phasing - Renovations and Legacy Models
    By sbrown in forum Revit Architecture - General
    Replies: 5
    Last Post: 2010-02-26, 10:25 AM
  2. Phasing of Linked Revit Models
    By cdchristian in forum Revit Architecture - General
    Replies: 3
    Last Post: 2009-09-01, 07:15 PM
  3. Before I start, Phasing or Worksets?
    By ntnik in forum Revit - In Practice
    Replies: 3
    Last Post: 2007-11-23, 06:56 PM
  4. Phasing linked models
    By jthompson.70974 in forum Revit Architecture - General
    Replies: 1
    Last Post: 2005-08-09, 09:52 PM
  5. Phasing & Worksets ?
    By aliya14 in forum Revit - Worksharing/Worksets/Revit Server
    Replies: 2
    Last Post: 2004-09-25, 01:30 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •