    Hi;
    in an old thread talking about the occupancy load, there were a schedule for the IBC Code and the schedule has a parameter and it and this parameter was not in the Project Parameter as shown in the attached image.
    1- How we can add a parameter to a schedule?
    2- Where i can find this parameter if it is not shown in the project or shared parameter?
    Attached Images Attached Images

  2. #2
    Super Moderator david_peterson's Avatar
    Join Date
    2002-09
    Location
    Madison, WI
    Posts
    5,687
    Login to Give a bone
    1

    Default Re: Schedule parameter

    If I had to take a guess, I'm looking at an image of a Key Schedule.
    The Key Schedule is looking at the Parameter "Use Classification"
    "Use Classification" was created in the shared parameter file and then added to the Project and I'm guessing applied to Room, Spaces, or Areas.
    But that's just my guess.
    ie you need to add it to your shared parameter file, I'm guessing it doesn't exist out of the box, in fact I'm sure of it. All of Autodesks Shared parameters are first letter upper case followed by lower case letters.

  3. #3
    Member
    Join Date
    2011-11
    Posts
    16
    Login to Give a bone
    0

    Default Re: Schedule parameter

    Thank you very much.
    you were right it was a Key Schedule but the "Use Classification" parameter wasn't shared parameter, I've just named the Key schedule with Use Classification and it appears as the image.

    Thank you.

Similar Threads

  1. 2017: Schedule Parameter
    By asiaashraf821339 in forum Revit Architecture - General
    Replies: 0
    Last Post: 2017-05-24, 01:07 PM
  2. Tag and schedule every parameter
    By Wish List System in forum Revit Architecture - Wish List
    Replies: 1
    Last Post: 2016-06-01, 11:37 AM
  3. Key Schedule Parameter
    By aaronrumple in forum Revit - API
    Replies: 17
    Last Post: 2014-01-17, 09:28 AM
  4. Replies: 1
    Last Post: 2013-06-08, 04:52 AM
  5. Phase parameter in schedule
    By ctc in forum Revit Architecture - General
    Replies: 3
    Last Post: 2009-02-27, 06:12 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •