Hi,
Can anyone help me with this.
I stayed up last last night trying to sort this with no success.
I was trying to schedule some isolated strip footing lengths and for the life of me could not get it to work, The length just wouldn't display. I tried with a wall footing and it worked no problem.
I looked at the length parameter in my isolated strip footing family and its under the constraints list. Could that be the reason its not dumping into the schedule?
Thanks for any advise