I want to schedule the total weight of my project and the calculated weight is consistently off by a factor of ~2.2 and I don`t know why.
I am working in metric units and the volume and density is shown correctly (both in Meters) in the schedule below.
My calculated formula looks like this : (Density/1)*Volume.
However, when i multiply Volume x Density the total is incorrect. The number in red should be 3,780. Any idea why?
augi.PNG