Hello,
Working in REVIT 2021 and fairly new to using Column Schedules. We have used them in the last few projects and they have worked great but, this current project is doing something weird.
This is a 3-Story Self Storage building. Most of the building is CMU except for two corners of the building which are 6" metal stud walls with tube steel columns.
In the column schedule they should be labeled as A-1, A-2, A-3, etc... but, instead they are showing like this A(3-5/8")-1,A(3-5/8")-2,A(3-5/8")-3,
Not sure where the 3-5/8" is coming from. All of the columns are centered on the grid lines.
Also, all of the tube steel columns in the interior of the building are working perfectly in the schedule. Just the columns in the exterior walls are giving issues.
Check the image and let me know if anyone knows why its doing this.
Column Schedule.PNG
Thanks for all the help!
Rob G.