Thread: "Inconsistent units" in calculated field

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    I could stop if I wanted to Exar Kun's Avatar
    Join Date
    2003-10
    Location
    Canberra, Australia
    Posts
    256
    Login to Give a bone
    0

    Default "Inconsistent units" in calculated field

    Hi, I'm trying to derive the wall height by dividing area by length as discussed elsewhere on this forum but I keep getting an error saying that the fields use incosistent units. I have gone into formatting and changed the field format to make sure that area is in square mm and length in mm and yet I still get the problem - anything I can do?

    Thanks.

  2. #2
    Super Moderator beegee's Avatar
    Join Date
    2003-05
    Location
    crusing 11 kms above Australia
    Posts
    5,153
    Login to Give a bone
    0

    Default Re: "Inconsistent units" in calculated field

    Before we get into the formula, keep in mind that the height derived from this calculation may not be consistent. For example, if a 200 mm wall B joins the end of another 200 mm wall -A, and wall A is 8.9 m long, then the length will report as 8.8m ( ie the mitre ). Also, if the profile of the wall has been edited it will not report a correct height. And, if the wall has been attached to another element, it will not report the correct height.

    Now the formula. You must always convert from the generic numbers to the units being used. So, in your case, Area is in square metres and Length is in millimetres, and you want the Height to be in millimetres also. Therefore you need to convert the area to square millimetres first, so that the whole formula is consistent in units.( Length is already in millimetres )

    So the formula conversion is -

    Height = Area / 1000 mm * 1000 / Length.

  3. #3
    The CADSmith Chad Smith's Avatar
    Join Date
    2003-05
    Location
    Brisbane, Australia
    Posts
    1,731
    Login to Give a bone
    0

    Default Re: "Inconsistent units" in calculated field

    We went through this in the office just last week, until we came across the mitre problem as you discussed, and have subsequently scrapped this idea. It's a bit of a tricky one.

    We were actually going to use this for curtain wall heights.

  4. #4
    I could stop if I wanted to Exar Kun's Avatar
    Join Date
    2003-10
    Location
    Canberra, Australia
    Posts
    256
    Login to Give a bone
    0

    Default Re: "Inconsistent units" in calculated field

    Thanks for that guys. We are looking into doing this for curtain wall heights aswell. I think it should work out OK but I'll double check.

    Thanks again.

  5. #5
    Revit Founder LRaiz's Avatar
    Join Date
    2003-07
    Location
    Newton, MA
    Posts
    714
    Login to Give a bone
    0

    Default Re: "Inconsistent units" in calculated field

    I am confused and can not reproduce described problem. Thus I do not follow the complexities of a solution offered by beegee.

    In my simple experiment using 7.0 I
    1. created a wall schedule that lists Area and Length
    2. defined calculated value that I called Height. I made sure that this parameter is of type Length (has units of Length)
    3. My simple formula is Area/Length.
    4. I am free to use whatever formating I want for Height (meters, millimeters, feet, etc.) regardless of units or formatting for Area and Length.

    What is different in your process and why can't I observe your problem?

  6. #6
    I could stop if I wanted to Exar Kun's Avatar
    Join Date
    2003-10
    Location
    Canberra, Australia
    Posts
    256
    Login to Give a bone
    0

    Default Re: "Inconsistent units" in calculated field

    I hadn't changed my parameter to type Length. That certainly made it less complicated.

Similar Threads

  1. 2014: Schedules - Calculated Value does not have "Count" in the list of fields
    By Bluefairy in forum Revit Architecture - General
    Replies: 3
    Last Post: 2013-08-29, 06:05 PM
  2. Replies: 0
    Last Post: 2012-06-06, 11:54 AM
  3. "Varies" in "Sill Height" Field for window schedule
    By BSaunders in forum Revit Architecture - Tips & Tricks
    Replies: 1
    Last Post: 2010-11-17, 11:58 PM
  4. Door Schedules, Calculated Values, and "Count" parameter
    By goodtastingsteak in forum Revit Architecture - General
    Replies: 5
    Last Post: 2010-05-21, 11:08 PM
  5. Schedules: Use "Count" in Calculated Values...
    By ronjon in forum Revit Architecture - Wish List
    Replies: 0
    Last Post: 2005-02-10, 01:53 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •