Page 1 of 3 123 LastLast
Results 1 to 10 of 24

Thread: Freedom Tower and Revit

  1. #1
    AUGI Addict MikeJarosz's Avatar
    Join Date
    2015-10
    Location
    New York NY
    Posts
    1,497
    Login to Give a bone
    0

    Default Freedom Tower and Revit

    Building Design and Construction Magazine has a good article about Tower One and Revit at:

    http://www.bdcmag.com/magazine/articles/bdc0504comp.asp

  2. #2
    100 Club
    Join Date
    2004-05
    Posts
    104
    Login to Give a bone
    0

    Default Re: Freedom Tower and Revit

    Hmmmm, so Revit 8 was released last month eh? I must have missed that!

  3. #3
    All AUGI, all the time BillyGrey's Avatar
    Join Date
    2004-04
    Location
    in a calm assertive state
    Posts
    638
    Login to Give a bone
    0

    Default Re: Freedom Tower and Revit

    Thanks for the vine, Mike.

    Regards

  4. #4
    All AUGI, all the time ajayholland's Avatar
    Join Date
    2003-04
    Location
    Sunny Southern California
    Posts
    505
    Login to Give a bone
    0

    Default Re: Freedom Tower and Revit

    I guess the “cat is out of the bag” with that article, although some of the features described are purely version 7.0, and other features (API) have already been publicly announced.

    “Interference detection, which scans models for conflicts between user-specifiable elements and systems, has been strengthened.”

    Checking the Autodesk website this morning, the new name is being displayed. It’s only a matter of days (or hours).

    ~AJH

  5. #5
    Revit Arch. Wishlist Mgr. Wes Macaulay's Avatar
    Join Date
    2003-05
    Location
    Vancouver, BC CANADA
    Posts
    3,348
    Login to Give a bone
    0

    Default Re: Freedom Tower and Revit

    Woah! The article says you can schedule across linked projects in R8! That's huge! I have several projects where we decided against linking because we couldn't schedule the data.

    This could change things a lot if the article holds true.

  6. #6
    Revit Mararishi aaronrumple's Avatar
    Join Date
    2002-02
    Location
    St. Louis, MO
    Posts
    4,695
    Login to Give a bone
    0

    Default Re: Freedom Tower and Revit

    Might help us out with our housing projects. However groups are still the biggest issue there.

  7. #7
    Moderator JamesVan's Avatar
    Join Date
    2016-01
    Location
    New York, NY
    Posts
    625
    Login to Give a bone
    0

    Default Re: Freedom Tower and Revit

    Quote Originally Posted by Wes Macaulay
    Woah! The article says you can schedule across linked projects in R8! That's huge! I have several projects where we decided against linking because we couldn't schedule the data.

    This could change things a lot if the article holds true.
    Whoa, indeed! I think this author needs to check his facts. Pretty sure that "cross-scheduling between models" has not been implemented yet.

  8. #8
    All AUGI, all the time ajayholland's Avatar
    Join Date
    2003-04
    Location
    Sunny Southern California
    Posts
    505
    Login to Give a bone
    0

    Default Re: Freedom Tower and Revit

    These notes were in the March 15th Autodesk press release:

    • Interference Detection scans models for conflicts between user-specifiable elements and systems

    • Easy upload of files from Autodesk Revit Building to an Autodesk® Buzzsaw® project site, and automatic conversion to DWG or Autodesk® DWF™ format

    • Link DWF markups made in Autodesk® DWF™ Composer, allowing you to keep your revision markup process digital, preserving data integrity and ease of sharing

    • New API allows developers to access object data, query properties, extract geometry and change properties.

    I am keenly interested in the link between Buzzsaw and Revit, as well as the ability to link DWF markups. I believe these features will help ease the level of resistance that we have encountered from some project consultants who have less sophisticated technology in place.

    ~AJH

  9. #9
    AUGI Addict MikeJarosz's Avatar
    Join Date
    2015-10
    Location
    New York NY
    Posts
    1,497
    Login to Give a bone
    0

    Default Re: Freedom Tower and Revit

    James is right. We read these articles carefully, and of course we know the inside story. The sad truth is that it is rare these articles are 100% factually correct. The Popular Science article was about 50% correct, and they interviewed SOM in person!

    So be careful with hearsay!

  10. #10
    AUGI Addict Joef's Avatar
    Join Date
    2003-12
    Location
    Victoria, BC
    Posts
    1,273
    Login to Give a bone
    0

    Default Re: Freedom Tower and Revit

    Quote Originally Posted by JamesVan
    Whoa, indeed! I think this author needs to check his facts. Pretty sure that "cross-scheduling between models" has not been implemented yet.
    You are right, I don't recall this feature in 8.0. What he is probably talking about is being able to schedule nested families.

Page 1 of 3 123 LastLast

Similar Threads

  1. Freedom Tower Redesign
    By RodneyLester in forum Revit Architecture - General
    Replies: 60
    Last Post: 2005-07-26, 02:11 AM
  2. More Revit/Freedom Tower news
    By Scott D Davis in forum Revit Architecture - General
    Replies: 1
    Last Post: 2005-01-19, 11:43 PM
  3. SOM Freedom Tower Webcast Available
    By Scott D Davis in forum Revit Architecture - General
    Replies: 7
    Last Post: 2004-11-01, 05:50 AM
  4. Revit & Freedom Tower
    By MikeJarosz in forum Revit Architecture - General
    Replies: 52
    Last Post: 2004-07-13, 01:12 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •