I have created a door tag that will allow a suffix (to accommodate more than 1 door into a room) and automatically number. The problem I am having is getting the tag to schedule. The standard schedule does not accommodate the suffix in any fashion other than a secondary column. The standard project based schedule requires a space (which my office does not use) but does pick up the suffix.
What I am looking to do is get the schedule to automatically pick up the door number that is entered as well as the suffix and insert them into the schedule in the same column (like the project based schedule does) without having to associate the tag/door with a space. Ideas?