There is a confirmed current limitation that each graded surface must have the same extent or be contiguous with an existing topo surface for Cut & Fill values to report correctly.
Read the full thread here.
|
|
|
There is a confirmed current limitation that each graded surface must have the same extent or be contiguous with an existing topo surface for Cut & Fill values to report correctly.
Read the full thread here.