    This problem seems to come up repeatedly. The old solution of splitting and moving a portion out of sight is problematic, The schedule filtering option in 6.0 provides a much better way to handle putting parts of the same schedule on more than one sheet.
    Create two schedules of the same type with the same data fields. Filter each schedule by some value that allows you to control where the schedule start and stops. For example you could filter a room schedule by level and include only levels up to 5 on one and levels above 5 on the other. Another method would be to use instance marks such as door numbers. Filter one schedule to show doors numbered < 525 and another so that it contains numbers > 524. After filtering, place each schedule on a different sheet.
    You may have to modify filter characteristics if you add a lot of new items and one of the schedules gets too long, but this is simply a matter of changing the filter criteria in the schedule's view properties.

  2. #2
    AUGI Addict aggockel50321's Avatar
    Join Date
    2003-05
    Location
    Waterville, Maine
    Posts
    1,748
    Login to Give a bone
    0

    Default Re: Split Schedules on Multiple Sheets

    Love that filter tool, David....

  3. #3
    Woo! Hoo! my 1st post
    Join Date
    2009-12
    Posts
    1
    Login to Give a bone
    0

    Default Re: Split Schedules on Multiple Sheets

    Is there an updated way to do this in 2011 without using filters?

  4. #4
    AUGI Addict
    Join Date
    2000-11
    Location
    Pittsburgh, PA USA
    Posts
    1,906
    Login to Give a bone
    0

    Default Re: Split Schedules on Multiple Sheets

    No 345678910

  5. #5
    Login to Give a bone
    0

    Default Re: Split Schedules on Multiple Sheets

    Yes there is a way of doing this is 2-3 seconds.

    Archigrafix Reports: The tool alows to split the schedule in multiple pages (send to printer/PDF/Word). Many formating possibilities, and auto-save of settings, so that it can be frequently done without needing to reset the format.
    http://www.archigrafix.com/reports-2017-perpetual.html

    There is a free trial on the website.
    http://www.archigrafix.com/downloads

Similar Threads

  1. Schedules & Multiple Sheets
    By azmz3 in forum Revit Architecture - General
    Replies: 8
    Last Post: 2017-01-05, 01:45 PM
  2. Split Schedules Over Multiple Sheets
    By Wish List System in forum Revit Architecture - Wish List
    Replies: 0
    Last Post: 2014-10-07, 09:37 PM
  3. Schedules over multiple sheets
    By dpollard909366 in forum Revit Architecture - General
    Replies: 17
    Last Post: 2011-01-24, 07:20 PM
  4. schedules on multiple sheets - instances?
    By jond in forum Revit Architecture - General
    Replies: 7
    Last Post: 2006-04-06, 08:09 PM
  5. Best way to split a building over 2 sheets
    By Max Lloyd in forum Revit Architecture - General
    Replies: 12
    Last Post: 2005-07-30, 01:35 AM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •