Results 1 to 5 of 5

Thread: How do you Schedule Curtain Walls?

  1. #1
    100 Club dgraue's Avatar
    Join Date
    2004-06
    Location
    Santa Monica, CA
    Posts
    184
    Login to Give a bone
    0

    Default How do you Schedule Curtain Walls?

    I am trying to determine the percent of "glazing" on a mixed use building. I can schedule the areas of exterior walls ok through filters as well as standard window areas, but I have not been able accurately schedule the openings for curtain walls and storefronts. I can schedule the individual glazed panels or the individual mullions but these do not add up to the glazed opening I need.

    Has anyone scheduled curtain walls to give you the overall opening area for each systems occurance?

    DG

  2. #2
    AUGI Addict aggockel50321's Avatar
    Join Date
    2003-05
    Location
    Waterville, Maine
    Posts
    1,748
    Login to Give a bone
    0

    Default Re: How do you Schedule Curtain Walls?

    If you schedule the panels by type & then under the formatting tab in the schedule properties, calculate totals for area, does that give you what you are looking for?

  3. #3
    AUGI Addict hand471037's Avatar
    Join Date
    2003-05
    Location
    Oakland, California
    Posts
    1,934
    Login to Give a bone
    0

    Default Re: How do you Schedule Curtain Walls?

    Quote Originally Posted by dgraue
    I can schedule the individual glazed panels or the individual mullions but these do not add up to the glazed opening I need.
    What you're looking for is actually a Wall Schedule. Make a Wall Schedule, not a mullion or panel one, and then filter out all the non-curtain-walls so ou just get the Curtain Walls. You'll be able to get their area then.

  4. #4
    100 Club dgraue's Avatar
    Join Date
    2004-06
    Location
    Santa Monica, CA
    Posts
    184
    Login to Give a bone
    0

    Default Re: How do you Schedule Curtain Walls?

    That's it...thanks Jeffrey.
    DG

  5. #5
    Woo! Hoo! my 1st post
    Join Date
    2013-08
    Posts
    1
    Login to Give a bone
    0

    Default Re: How do you Schedule Curtain Walls?

    @DG's problem (I'm assuming you've fixed it somewhere along the way in the past 8 years)
    1. Vision Vs Solid Vs Curtain Walls- Make a Wall Schedule that shows you how much of your project is vision. Define either or by the wall's Type Comment parameter. Sort by Comment and calculate grand totals for area
    2. %Visibility of Curtain Walls- Use the panel family's Type Comment parameter to refer to something as either solid or vision. Then sort by Type Comment and calculate grand totals of area.

    It's not perfect but is a solution.

Similar Threads

  1. Schedule Curtain Walls within a Window Schedule
    By Wish List System in forum Revit Architecture - Wish List
    Replies: 2
    Last Post: 2020-10-21, 01:51 PM
  2. Replies: 0
    Last Post: 2009-01-31, 03:55 PM
  3. Custom curtain wall panels on curved and slanted curtain walls/systems
    By AP23 in forum Revit Architecture - General
    Replies: 2
    Last Post: 2008-06-02, 09:08 PM
  4. Windows + Curtain walls in a Glazing Schedule?
    By mibzim in forum Revit Architecture - General
    Replies: 0
    Last Post: 2006-12-11, 12:40 AM
  5. Window Schedule for Curtain Walls
    By matt.98118 in forum Revit Architecture - General
    Replies: 10
    Last Post: 2005-12-06, 03:36 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •