I have made a schedule for room occupancy using a formula where the aea is divided by the load factor. I want to make sure that the reult is rounded up. How do I go about doing this?
Thanks
Pinky
I have made a schedule for room occupancy using a formula where the aea is divided by the load factor. I want to make sure that the reult is rounded up. How do I go about doing this?
Thanks
Pinky