Our company has 1 struct. engineer, 4 geotechs with two cad techs. I was the only cad tech for six years With a feast or famine work load we had to hire another cad tech. The only problem is some weeks the two of us barely get by while the next week is all paperwork and then onto solitaire. This arrangement still works better than holding up the field crew which costs thousands per day.