how does everyone handle walls with batt insulation? there are 2 things that i would like to do (my workarounds are included). Can anyone think of a better solution?
Example
1/2" gwb both sides of 2x4. 1 wall has batts, 1 wall doesn't. i can't create 2 walls, becasue there is no where for the batt materials so:
1. create a shared parameter (instance) that i would attach to the walls, so when checked it would at least be tagable seperatly from when it is not checked.
2. to schedule, scheudle the studs and rename the schedule to batts.
Did i miss something, or is this the way to fly?
Thanks
justin


Reply With Quote
