Results 1 to 4 of 4

Thread: Sorting Schedules

  1. #1
    Member
    Join Date
    2006-09
    Posts
    17
    Login to Give a bone
    0

    Default Sorting Schedules

    I have been trying to figure out how to get a schedule to sort properly. One of the things we draw is the wall framing for each wall in every house we build. I found a schedule that I've been using but it won't sort the pieces in each wall by length. Any Ideas? I've attached a dwg file with a sample wall.

    Thanks.
    Attached Files Attached Files

  2. #2
    Time Lord Steve_Bennett's Avatar
    Join Date
    2015-12
    Location
    far, far, far away...
    Posts
    4,730
    Login to Give a bone
    0

    Default Re: Sorting Schedules

    It is sorting, it is just sorting based on the last digit of the fraction. You would need to add an extra column to the schedule that uses a property set def driven by a decimal property data format and hide the column in the schedule and then sort the schedule based on the new column.
    Steve Bennett |BIM Manager
    Taylor Design | Adventures in BIM

  3. #3
    ACA/AMEP Community Chair stelthorst's Avatar
    Join Date
    2003-10
    Location
    San Francisco CA
    Posts
    1,190
    Login to Give a bone
    0

    Default Re: Sorting Schedules

    Hi Rob,

    I have modified your drawing implementing Steve's suggestion.

    I added another column and added the unformatted length. I then sorted by this column and set this column to hide.

    Hope this helps,
    Attached Files Attached Files
    Scott Telthorst
    Quality Control Manager
    Helix Electric, Inc.
    www.helixelectric.com

    Some see the glass as half full, others as half empty. As an engineer I see the glass as twice as big as it needs to be. ~Unknown~

  4. #4
    Member
    Join Date
    2006-09
    Posts
    17
    Login to Give a bone
    0

    Smile Re: Sorting Schedules

    Thanks for the help! That was exactly what I was looking for. It's great to have a place like this where you can get help for things that you're still learning!

Similar Threads

  1. Key Schedules - Added Project Parameter not Available in other Key Schedules
    By lhanyok in forum Revit Architecture - General
    Replies: 4
    Last Post: 2012-09-14, 03:31 PM
  2. Create Schedules, View and Add circuits to panel schedules in a linked file.
    By autocad.wishlist1734 in forum Revit MEP - Wish List
    Replies: 0
    Last Post: 2011-10-10, 12:17 PM
  3. Project Browser Sorting for Schedules, Legends, etc.?
    By sfraney in forum Revit Architecture - General
    Replies: 4
    Last Post: 2008-12-09, 06:14 PM
  4. Sorting schedules based on what is on the sheet.
    By dtownsend in forum Revit Architecture - General
    Replies: 2
    Last Post: 2007-05-18, 02:37 AM
  5. Schedule Sorting
    By chris.macko125036 in forum Revit Architecture - General
    Replies: 5
    Last Post: 2007-01-17, 06:53 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •