I am using the "elevation at bottom" field as part of my schedule. I have itemize every instance checked on (for my check process). I have a couple of walls that are reading "varies" in this column in the schedule. My problem is the elevation does not vary. To make matters more confusing, they are drawn exactly the same as the other walls that are scheduling fine. If I pull the wall back so it does not intersect with it's neighbour (that is drawn the same way) it schedules the elevation correctly. As soon as I trim to join the walls, the one wall schedules "varies" again. AHHHHHHHHHHHHHHH!
Makes no sense to me. All of the wall properties are identical to the walls that are scheduling correctly. Any Ideas? Thanks in advance, Jen