Originally Posted by
bbambu
I could've sworn I've done it before. Maybe I'm just losing it. I remember early on I didn't know the difference between schematic pipe and schematic lines, and I made a few mistakes. However, I remembered the fittings appearing when I changed elevation midway through running schematic pipe (plumbing line) a fitting appearing, and I could move that fitting freely. It's been my expereince that schematic symbols don't automatically appear because you can't change elevations with a schematic line. Maybe it was a temporary glitch. In any case, if they haven't made plumbing lines flexible in 2008, they should do that next time.